本文目前仅提供英文版本,中文翻译即将上线。

What this guide covers: How ChinAfrika Logistics Limited handles cargo claims from first notification through settlement — what to report, by when, what documentation you'll need, and how claims get resolved.

Damage happens. Cargo gets delayed. When it does, what matters most isn't that something went wrong — it's how quickly and fairly it gets resolved. As a registered Non-Vessel Operating Common Carrier (NVOCC), CALL handles every cargo claim with the same standard: professional diligence, transparent communication, and a fair outcome.

This guide walks through our claims process end to end, so you know exactly what to expect if you ever need to file one.

What This Covers

This process applies to claims arising from our ocean and air shipping services between China and Africa, including:

  • Physical damage: crushing, water damage, contamination, or breakage.
  • Loss: complete disappearance of cargo, or significant partial loss.
  • Concealed damage: damage discovered after delivery, with intact packaging.
  • Delay: failure to deliver within contracted or reasonable timeframes.
  • Financial loss: additional costs you incur due to a service failure.
  • Documentation errors: losses resulting from incorrect or missing paperwork.

Ocean freight claims are handled under the Hague-Visby Rules or applicable conventions; air freight claims fall under the Warsaw Convention / Montreal Convention framework. As an intermediary NVOCC, we may be jointly responsible with ocean carriers for loss or damage during carriage, subject to our own rights of indemnity against the primarily liable party — so part of our job is managing that chain on your behalf, not just processing your paperwork.

Step 1: Reporting Your Claim

The moment you notice damage, loss, or a delay, contact our Customer Service team. Here's what happens next:

  • Acknowledgment within 4 business hours: we confirm receipt of your notification and issue a unique claim reference number for all future correspondence — regardless of how complete your initial information is.
  • Initial information we'll ask for: your contact details, booking reference and bill of lading/air waybill number, the date and location the issue was discovered, a brief description of the damage or loss, and photos if you have them.
  • Internal escalation: for claims we estimate above $1,000, our Claims Manager is notified within 24 hours so the case gets senior attention from the start.

⚠️ Watch Out: Claim deadlines are strict and vary by cargo type — some as short as 3 days for visible ocean cargo damage. Report as soon as you notice a problem; don't wait to gather every document first.

Critical Deadlines by Claim Type

Different claim types carry different statutory and contractual deadlines. Missing one can affect your ability to recover, so this table is worth bookmarking:

Claim Type Notify Us By Submit Formal Claim By Basis
Air — Visible Damage Immediately, on delivery receipt 14 days from receipt Warsaw/Montreal
Air — Delay 21 days from availability 21 days from availability Warsaw/Montreal
Air — Loss 120 days from AWB date 120 days from AWB date Warsaw/Montreal
Ocean — Visible Damage 3 days from delivery 1 year from delivery Hague-Visby
Ocean — Concealed Damage 15 days from delivery 1 year from delivery Hague-Visby
Financial Loss 30 days from discovery 6 months from incident Company T&Cs

👉 Pro Tip: As an NVOCC, we also have to submit claims against underlying ocean carriers within their own contractual deadlines — which are sometimes shorter than the statutory limits above. Reporting early gives us the best chance of recovering on your behalf.

Step 2: Documentation You'll Need

To process your claim, we'll need:

  • Completed Claim Form (downloadable below)
  • Copy of the original bill of lading or air waybill
  • Commercial invoice showing the value of goods
  • Packing list with detailed cargo description
  • Delivery receipt with notation of damage or shortage, if applicable
  • Photographs or video of the damaged cargo and packaging
  • Survey report from an independent inspector, if one was obtained
42%

Incomplete documentation accounts for roughly 42% of claim rejections industry-wide. Gathering the full set above before submitting your claim is the single best thing you can do to avoid delay. Industry-wide estimate

Step 3: How We Investigate

Once your claim is logged, our investigation moves through three phases:

  • Evidence collection (Days 1–3): we gather operational records, handling logs from origin to destination, statements from staff and subcontractors, and CCTV footage where available.
  • Technical assessment (Days 4–10): we check whether packaging met IATA/IMO standards, whether cargo was properly secured and stowed, whether temperature or humidity controls were maintained for sensitive cargo, and whether there's a history of prior damage on the same container or equipment.
  • Liability analysis (Days 11–15): we apply the terms of your bill of lading or waybill, reference the relevant international convention, consider force majeure provisions, and assess whether contributory factors on the shipper or consignee side played a role.

Throughout this process, you're expected to take reasonable steps to prevent further damage — separating affected goods, arranging protective measures, and preventing deterioration. This isn't about shifting blame; failing to mitigate can reduce your eventual compensation, so it's in your interest as much as ours.

Step 4: How Compensation Is Calculated

  • Total loss: based on actual cash value at destination, minus salvage value, plus incidental costs — excluding consequential damages unless specifically declared in advance.
  • Partial loss: based on repair estimates, diminution in value, and reconditioning costs.
  • Specialized cargo: perishables are valued on condition at delivery; dangerous goods claims also involve a regulatory compliance check.

Where no value was declared in advance, compensation follows international standard limits — for example, a per-kilogram limit for air cargo, or package limitations under ocean freight conventions. Declaring cargo value upfront is the way to avoid being capped at these default limits.

Step 5: Settlement

Depending on the claim's value and complexity, settlement can take a few different forms:

Full Settlement

Payment of the validated claim amount in exchange for a liability release.

Partial Settlement

Used where liability is shared or the claimed amount is disputed.

Replacement or Repair

Arranging repairs or replacement goods instead of a cash payment.

Future Service Credit

Credit toward future shipments, by mutual agreement.

Larger or more complex claims go through additional internal review — claims above $5,000 require Head of Operations sign-off, and anything over $20,000 goes to our Chief Operating Officer. Any claim where liability is genuinely contested is routed to our Legal Department regardless of value.

👉 Pro Tip: If liability is contested, our process moves through escalation to Legal, then mediation (commonly via FIATA), then arbitration (Singapore, Hong Kong, or London), and litigation only as a last resort — in the jurisdiction specified in your contract. Most disputes resolve well before reaching that final stage.

How We Prevent Claims in the First Place

  • Root cause analysis: for claims over $2,000, we identify direct and systemic causes and implement corrective action, with monthly analysis reports feeding back into our operations.
  • Packaging compliance: we conduct pre-shipment audits, educate suppliers on IATA/IMO packaging standards, and reserve the right to reject cargo with inadequate packaging before it ever ships.
  • Client education: we provide guidance on documentation requirements, liability limitations, and cargo insurance options — ask your account manager if you'd like a walkthrough before your next shipment.

Key Takeaways

  • Report immediately: some deadlines are as short as 3 days — don't wait to gather every document before notifying us.
  • Documentation prevents rejection: incomplete paperwork causes roughly 42% of claim rejections industry-wide.
  • Declare value upfront: undeclared cargo defaults to standard per-kilogram or package liability limits.
  • Mitigate further damage: your own reasonable steps to limit loss protect your eventual compensation.

Download the Claim Form

To start a claim, download and complete our Cargo Claim Form, then send it to your Customer Service representative along with the supporting documentation listed above.

CALL Cargo Claim Form

Word document (.docx) · Sections 1–5 with documentation checklist

Download Form →

Additional claims resources — including sample settlement matrices and escalation contacts — are available on request from our Trade and Compliance team.

Need to report a claim?

Contact our Customer Service team directly — the sooner you reach out, the more options we have to help.

Contact Customer Service →

Last reviewed: July 2026  ·  Category: Company Essentials